13

Ghyabi & Associates, Inc. has been retained by Stone, Joca & Mahoney, Inc to provide a traffic study and (2) two signal warrant studies for the existing No-Build an two Build alternative conditions, to coordinate with the widening of Girvin Road located in Jacksonville, Florida. Girvin Road currently is planned to be widened to a 4-lane urban collector by the First Coast MPO and is programmed for fiscal years 2002/2003 thru 2006/2007. The study included capacity analyses for current year 2003, 2010, and 2025.