|
14 |
Ghyabi & Associates, Inc.
was retained by Stone, Joca & Mahoney, Inc to provide a
traffic study and (2) two signal warrant studies for the existing
No-Build an two Build
alternative conditions, to coordinate with the widening of Girvin Road
located in
Jacksonville, Florida. Girvin Road was planned to be widened
to a 4-lane urban
collector by the First Coast MPO and is programmed for fiscal years
2002/2003 thru
2006/2007. The study included capacity analyses for current year 2003,
2010, and 2025. |